CFMS are proud to have been part of the successful HV cable installation between Ardmore, Skye and Beacravik in Harris. Providing diving and surface support on removal of the old cable, pulling the new cable into position and installing a protection system.
The project was run during peak tourist season which proved to create logistical challenges however with the support of our client and some very helpful locals in Skye and in Harris, the project was completed successfully and on time.
With picture postcard settings and a project team with an excellent, positive attitude, it was a pleasure to have been part of this experience.
Thank you to all involved.